  54.       
Meeting Date: 05/11/2015  
Sprial
Submitted for: Leticia Gutierrez Submitted By: Leticia Gutierrez
Department: Purchasing  

Subject:
Discussion and possible action to approve the Electrical improvements of Sewer plant and the purchase of One (1) new and install One (1) Sewer Raw Water Spiral Screen Webb County Annual Contracts RFP2015-46 &47 from Square E. Engineering in the amount of $333,700.00.  [Requested by Adrian Montemayor, Water Utility System Manager] [Approved by Capital Outlay Committee, Fund #604-0101-8103]

Issue: 
Rio Bravo Sewer Plant has been extremely limited in its capacity to effectively and efficiently treat wastewater; however, through modifications and additional work schedules we have been able to provide treated effluent meeting permit standards. However, the severe limitation and dilapidated equipment leave the sewer plant at an emergency level of which could result in a catastrophe of untreated sewer, personnel safety, and health concerns for our public. Therefore staff recommends we proceed immediately to acquire proposals and expedite the acquisition and installation of the electrical improvements.

Solution: Sewer Lift Station- this station consists of electrical repairs and changes to where operators can maintain control and have redundancy of the pumping system that flow the raw wastewater into the plant and begins the treatment process. Aeration Basins – This unit is the critical treatment unit of the plant that provides the physical change of the water; however, until now these four units have been operating at only 35% of their original capabilities due to severe losses in the electrical controls of the units. This project will replace much electrical modifications done in the past and place the operating controls back to their original method of operation, with redundant capacities. This includes the replacement of valve actuators that enable us to use the complete system. Lighting – This element has limited our ability to work safely at night and provides the required security of the facilities.

Result: Effectively treat the raw water and provide compliant effluent.
Background:
none
Previous Court Action:
none

Fiscal Impact
Budget Account Number: 604-0101-8103
Funding Source: 604
Balance: 333,700.00
Financial Impact:
333,700.00