An unknown charge caused a complete frying of the electrical panel deeming the plant inoperative through conventional power. It is currently operating under backup diesel power until a new panel can be ordered and installed. We cannot assure the operation under back up power for extended periods of time.
Upon the identification of the power loss and loss of operation of the lift station, we contacted our instrumentation contractor to assist in identifying the loss of pump operation control. His response and evaluation identified the cause of the interruption at that time to be the fried electrical panel. However, we will not know until for conventional power is restored if the instrumentation control system is working properly.
I asked the contractor (Square E Engineering) to provide me a cost for the panel replacement on an expedited process. Upon receiving the cost of the equipment and installation, I asked him to proceed on an emergency basis with the expectation that he was the annual contractor at the time to get a head start on the equipment acquisition.
|