REVERSE OSMOSIS SYSTEM FOR LOS BOTINES FIRE STATION #3
Submitted for:
Martha Palacios
Submitted By:
Martha Palacios
Department:
Engineering
Subject:
Discussion and possible action to approve a Reverse Osmosis System with Chlorinator from Marion Services, LLC., in the amount of $3,795.00 for the Los Botines Fire Station #3; and authorize the County Judge to execute all relevant documents. [Account #1001-1130-001-431-007-010 (Operational Reserve)]
Issue: Well water does not meet Texas Commission on Environmental Quality (TCEQ) drinking water standards.
Solution: The installation of a Reverse Osmosis System with Chlorinator will meet TCEQ requirements for well water use at this location.
Result: Compliant clean water for drinking, eating and bathing.